What’s Included?
✔ Luminous NXIT130 3KW On-Grid Inverter
✔ 550Wp DCR Bifacial Solar Panels
✔ Standard GI Mounting Structure
✔ ACDB & DCDB Protection
✔ Chemical Earthing
✔ UV Protected Solar DC Cables
✔ FRLS AC Cables
✔ MC4 Connectors
✔ Wi-Fi Monitoring
✔ Complete Installation & Commissioning
✔ Net Meter Documentation Support
Estimated Performance
| Particular | Estimate |
|---|---|
| Solar Capacity | 3KW |
| Monthly Generation | 330–420 Units |
| Annual Generation | 4,000–5,000 Units |
| Estimated Monthly Savings | Rs. 3,000–4,500 |
| Payback Period | 4–5.5 Years |
Warranty
- 10 Years Manufacturer Warranty on Luminous On-Grid Inverter
- 25 Years Performance Warranty on DCR Bifacial Solar Panels
Why Choose JK Agencies?
- Local Chennai-based installation team
- Professional site inspection
- High-quality DCR panels
- Complete documentation support
- Transparent pricing
- Fast installation
- After-sales support
Installation Process
- Free Site Visit
- Roof Assessment
- Quotation
- Order Confirmation
- Material Delivery
- Installation
- Net Meter Documentation
- Commissioning
Government Subsidy (Residential Customers)
PM Surya Ghar: Muft Bijli Yojana
Eligible residential consumers installing rooftop solar systems may avail Government subsidy under the PM Surya Ghar: Muft Bijli Yojana, subject to the latest guidelines issued by the Government of India and the local electricity distribution utility.
Current indicative subsidy:
- 3KW System: Up to Rs. 78,000
- 5KW System: Up to Rs. 78,000 (the subsidy is generally capped at the applicable limit for eligible capacities)
Our Support Includes:
- ✔ Preliminary eligibility guidance
- ✔ Net meter documentation support
- ✔ Assistance with subsidy-related documentation (where applicable)
- ✔ System commissioning support
Note: Subsidy is available only for eligible residential consumers and is subject to Government norms, technical feasibility, and approval by the concerned authorities. Commercial and industrial service connections are generally not eligible under the PM Surya Ghar residential subsidy scheme.
Frequently Asked Questions
Is subsidy available?
Residential customers may be eligible subject to prevailing Government guidelines and applicable scheme conditions.
How much roof space is required?
Approximately 180–220 sq.ft.
How long does installation take?
Usually 2–3 working days after material delivery.
Can it work during a power cut?
No. A standard on-grid inverter switches off during a power outage for safety. If backup is required, ask us about hybrid systems.
Do you handle net meter documentation?
Yes.






